Arrow VT1231 Manual de Instruções Página 10

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 43
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 9
It is important that the entire floor frame be anchored after the building is erected.
Below are recommended ways of anchoring.
Anchoring Down The Building
Anchoring
BX10
Arrow Anchoring Kit: (Model No. AK100 or 68383)
Recommended for use with the concrete foundation.
Contains: Corner gussets, perimeter clips, hardware,
1/4" masonary drill bit and installation instruction.
Anchoring into Concrete:
1. For poured concrete slab or footing or patio blocks:
Use 1/4" x 2" Lag Screws.
2. For Anchor Post of Concrete poured after building is
erected: Use 1/4" x 6" Lag Screws.
Arrow Anchoring Kit: (Model No. AK4 or 60298)
Recommended for use with any suggested base.
Contains: 4 Anchors with Cable, Clamps and
installation instruction.
Anchoring into Wood/Post:
Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia.
holes provided in the frames for proper anchoring.
10
OVER THE BEAMS
AND INTO THE GROUND
1.
2.
1. 2.
Vista de página 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 42 43

Comentários a estes Manuais

Sem comentários