* Size rounded off to the nearest foot
BUILDING DIMENSIONS
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
713771207
Model No. VT1421-A 697.68612-A
VT1431-A 697.68613-A
Owner's Manual & Assembly Instructions
BX01
Exterior Dimensions Interior Dimensions
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall)
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height
14' x 21' 164" x 255 1/2" 291 2527 169" 260 3/4" 116" 164" 255 1/2" 114 1/2"
14' x 31' 164" x 370 1/2" 422 3663 169" 375 3/4" 116" 164" 370 1/2" 114 1/2"
4,3m x 6,4m 4,17m x 6,49m 27,0m 71,6m 4,29m 6,62m 2,95m 4,17m 6,49m 2,91m
4,3m x 9,5m 4,17m x 9,41m 39,2m 103,7m 4,29m 9,54m 2,95m 4,17m 9,41m 2,91m
23
23
Vista de página 0
1 2 3 4 5 6 ... 43 44

Resumo do Conteúdo

Página 1 - VT1431-A 697.68613-A

* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV

Página 2 - BEFORE YOU BEGIN

It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil

Página 3 - PLAN AHEAD

1166769Door Slide (2)66382Lower Door Guide (2)7972Door HandleLock Bracket (1)7022Eave Bracket4 (14x21)8 (14x31)66646Washer960 (14x21)1400 (14x31)66444

Página 4 - SAFETY FIRST

Parts List12Assembly Part PartKey No. Number Description Carton 1 Carton 2 Carton 3 Carton 4 Carton 5 1 7023 Left Roof Trim 2 2 7024 Right Roof Trim

Página 5 - CARE & MAINTENANCE

13Assembly by Key No. for 14x21 BuildingBX13

Página 6 - ACCESSORIES

Additional Parts for & 14' x 31'14Carton 6 & 7Assembly Part Part Wayne DaltonKey No. Number Description Door Carton 8 Carton 965 947

Página 7

15Assembly by Key No. & 14' x 31' BuildingBX15

Página 8

1 Assemble 1/2 truss at a time. At-tach column gusset to lower chordsecurely using #1/4-20x1/2" hex headbolts and square nuts. All other con-ne

Página 9 - Foundation

The gables go on top of the front andrear walls to support the roof beams.The center columns support the trussand the framework.NOTEThe gables are pac

Página 10 - Anchoring

The roof beams join the gables to thetruss and supports the roof panels.1 Align the holes on a left and rightroof beam back-to-back and fastentogether

Página 11 - Hardware for Building

1 Place the floor frame pieces on thefoundation. Assemble the 4 cornersof the floor frame using 3 bolts fromthe bottom with nuts on top at eachcorner

Página 12 - Parts List

2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand

Página 13

1 Fasten side floor frames togetherwith a column gusset using 2 boltsfrom the bottom and nuts on top. Atrear of building, repeat procedure.2 Positio

Página 14

NOTEThe remainder of the buildingassembly requires many hoursand more than one person. Tiedown and support assemblybefore the end of the work day.A p

Página 15

The mid frame pieces give rigidity tothe sides and rear wall.NOTE Before installing side wallchannels decide at which locationyou want the side entra

Página 16 - ● Parts Needed For ●

1 Position right side eave channelagainst support columns. Fastenchannel to corner panel. Fasten col-umns to side eave channel using 2bolts and nuts

Página 17 - Gables/Column Assemblies

1 Fasten front frames at the top tofront wall panels with 3 screws. Donot fasten hole nearest door openingat this time.2 Fasten front columns to the

Página 18 - Roof Beam Assemblies

1 Position Truss Assembly on build-ing by sliding column gussets overcenter columns and fasten with 8bolts and nuts on each gusset.2 Position right an

Página 19 - Floor Frame Assembly

Each wall panel has a crimped rib on1 side. The crimped rib should gounder the rib of the panel that followsit.1 Fasten the wall panels at the topand

Página 20 - Gusset/Center Column

Step 12BX27● Parts Needed For ●Wall Channel/Door Jamb●●●●● 9477 Door Jamb (2)●●●●● 9466 Wall Channel (2)27Top ViewThe door jambs reinforce the doorope

Página 21

Step 13BX28● Parts Needed For ●Gable/Roof Beams●●●●● Right Gable Assembly (1)●●●●● Roof Beam Assembly (2)28STEP21Lift and fasten a right gable assem-b

Página 22

29●●●●● Roof Beam Assembly (8)●●●●● Left Gable Assembly (2)●●●●● Right Gable Assembly (1)●●●●● 9462 Roof Beam Assembly (5 14x31)● Parts Needed For ●Ga

Página 23 - Side Door Frames

3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go

Página 24 - Front/Rear Frames

30●●●●● 6954 Gable-Truss Strut (4 14x21) (2 14x31)● Parts Needed For ●Gable-Truss StrutStep 15STEP1STEPSTEP23BX301Fasten a gable-truss strut to

Página 25 - Truss/Top Frames

31Squaring the BuildingStep 16STEP1STEP23BX31STEP451Square the building on the founda-tion and at the top, by measuringdiagonally from corner to corne

Página 26 - Walls Panels/Track Supports

32● Parts Needed For ●Left/Right Roof PanelsStep 17STEP2BX32●●●●● 9492 Right Roof Panel (2)●●●●● 9493 Left Roof Panel (2)Installing the roof panels is

Página 27 - Wall Channel/Door Jamb

33● Parts Needed For ●Roof PanelsStep 18STEPSTEP3BX33●●●●● 9491 Roof Panel (4)1Position a roof panel overlappingrib of left corner roof panel. Fasteno

Página 28 - Gable/Roof Beams

34● Parts Needed For ●Ridge CapStep 19BX34●●●●● 9509 Ridge Cap (1)1STEP1Install a ridge cap on the com-pleted roof section using bolts andnuts. Do no

Página 29 - 3Apply the weather stripping

35● Parts Needed For ●Roof Panels & Ridge CapStep 20BX35●●●●● 9509 Ridge Cap (1)●●●●● 9491 Roof Panel (6)2STEP1Install 4 roof panels working sidet

Página 30 - Gable-Truss Strut

36● Parts Needed For ●Roof Panels/Ridge CapsStep 21BX36●●●●● 9509 Ridge Cap (1)●●●●● 9512 Ridge Cap (1 1431)●●●●● 9491 Roof Panel (4 14x21) (12 14x31)

Página 31 - Squaring the Building

37● Parts Needed For ●Roof TrimStep 22BX37●●●●● 7023 Left Roof trim (2)●●●●● 7024 Right Roof Trim (2)●●●●● 9510 Side Roof Trim (6)●●●●● 9513 Side Roof

Página 32 - Left/Right Roof Panels

38● Parts Needed For ●Side Door AssemblyStep 23BX38●●●●● 10490 Door (1)●●●●● 10505 Horizontal Door Brace (2)●●●●● 9500 Vertical Door Brace (2)NOTETo

Página 33 - Roof Panels

39● Parts Needed For ●Door InstallationStep 24BX39Door Assembly (1)●●●●● 7972 Door Handle Lock Bracket (1)1Position door slides onto the legs,from the

Página 34 - Ridge Cap

4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build

Página 35 - Roof Panels & Ridge Cap

40● Parts Needed For ●Vertical Tracks Roll-Up-DoorStep 25BX401 Attach right and left vertical tracksloosely to right and left track supportsusing 1/4-

Página 36

41● Parts Needed For ●Roll-Up-DoorStep 26BX41●●●●● 7817 Spring Support Bracket (2)●●●●● 10455 Track Strut (2)STEP1STEP31Install spring support bracket

Página 37

42● Parts Needed For ●Roll-Up-DoorStep 27BX42CAUTION:FROM THIS POINT ON, BE SURETO USE EXTREME CAUTIONUNTIL THE DOOR IS PROPERLYSPRUNG AND OPERATING1A

Página 38

43Step 28BX43STEP2STEP11Position right and left door jambsto right and left track supports withnotched end on top, facing insidebuilding.2Fasten long

Página 39

SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin

Página 40 - Vertical Tracks Roll-Up-Door

Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia

Página 41 - Roll-Up-Door

6ACCESSORIES... BW06 Web* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20-30cm)

Página 42

THIS PAGEWA SLEFTBLANKINTENTIONALLY7

Página 43 - Right/Left Door Jambs

THIS PAGEWA SLEFTBLANKINTENTIONALLY8

Página 44 - 713771207

The Foundation For Your Building9Foundation BX9Concrete SlabThe slab should be at least 4" (10cm) thick. It must be level and flat to provide