Exterior Dimensions Interior Dimensions Door *Approx.
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
11Remove from bag of screwsand save for the last step67293Weather Stripping (1)67545Weather Stripping (1)66382Lower Door Guide (4)66183Roof Trim Cap(2
Assembly Part Part Quantity CheckKey No. Number Description In Carton List 1 3719 Door Handle Brace 2 2 9373 Front Wall Panel 2 3 6020 Corner
221721813131313919201998131313132221171919203030445577373737373716162828661919202829303031333312121212121212122626222727353536101014141515111111101018
The front floor frame is made up ofthree pieces. The side floor framesand the rear floor frame are made upof two pieces. The holes in thesepieces will
Step 2SO1515● Parts Needed For ●Frame AssembliesThe main frame pieces reinforce thewalls. These pieces will later be in-stalled in the center and at t
16The roof beams join the two gablesand support the roof panels. The mainroof beam is made up of four piecesoverlapped back to back at the cen-ter. Th
17NOTE:Door Track Splice (painted part)Step 4A17● Parts Needed For ●Door Track Assembly●●●●● 6403 Door Track Splice (1)●●●●● 9366 Door Track (2)66769S
●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)● Parts Needed For ●Floor FrameStep 5SO18The floor frame must
1 Position a corner panel at thecorner of the floor frame as shown.The widest part of each corner panelmust be placed along the side of thebuilding f
Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
●●●●● Rear Wall Channel Assembly (1)●●●●● Side Wall Channel Assembly (2)● Parts Needed For ●Mid FramesStep 7SO2020The mid frame pieces give rigidity t
●●●●● Door Track Assembly (1)●●●●● Rear Wall Angle Assembly (1)●●●●● Side Wall Angle Assembly (2)● Parts Needed For ●Top FramesStep 8SO2121The top fra
●●●●● 6515 Wall Panel (10)● Parts Needed For ●Wall PanelsStep 9SO2222Each wall panel has a crimped rib onone side. The crimped rib should gounder th
●●●●● 9369 Door Jamb (2)●●●●● 9365 Front Wall Channel (2)● Parts Needed For ●Front Channel/Door JambStep 10SO23The door jambs reinforce the dooropenin
24The gables go on top of the front andrear walls to support the roof beams.1 Apply green edge trim to the topedge of the large left gables, smallleft
● Parts Needed For ●Gables/Roof BeamsStep 12ZO25●●●●● Left Gable Assemblies (2)●●●●● Right Gable Assemblies (2)●●●●● Single Roof Beam Assemblies (4)●●
● Parts Needed For ●Roof Beam/BracesStep 13SS26●●●●● Main Roof Beam Assembly (1)●●●●● 6227 Roof Beam Brace (2)261 Fasten the track supports to thefron
27Step 14ZO27● Parts Needed For ●Right Roof Panel●●●●● 7862 Right Roof Panel (1)Installing the roof panels is best donewith a step ladder. Begin insta
1 Install a left roof panel at the leftrear corner of the roof.2 Install two roof panels in the se-quence shown on previous page.Follow fastener sequ
29Step 16ZO29NOTEIf roof beam holes do not line upwith the roof panel holes, shift thebuilding from left to right.If this does not help, your building
Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with goo
1 Install two roof panels, left roofpanel, three ridge caps 6797 andright roof panel on the front of theroof as before.2 Fasten the roof panel ribs, p
311 Attach the right, left and side rooftrim to the lower end of the roof pan-els on each side of the building usingscrews at each panel overlap.NOTEA
32●●●●● 3719 Door Handle Brace (2)●●●●● 10475 Right and Left Doors (2)●●●●● 10497 Horizontal Door Brace (4)●●●●● 6278 Vertical Door Brace (2)● Par
33Step 20SQ33● Parts Needed For ●Door Installation & Adjustment●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)1 From inside the building
AnchoringAnchor your building at this time.Floor FrameIf you have purchased a Floor Frame Kit you need to install it at this time.34Anchoring and Floo
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin
Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your buildi
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
ACCESSORIES... A06* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20,3-30,5 cm)
7THIS PAGEWA SLEFTBLANKINTENTIONALLY
8THIS PAGEWA SLEFTBLANKINTENTIONALLY
The Base For Your Building9FRONT(DOOR)FRONT(DOOR)Base F09Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR FRAME KIT: (Ord